DrillManager

Automated drill
management system

DrillManager lets you control the drilling in accordance with the project, which ensures that the rock will collapse properly and minimize flyrock during blasting.

You can see the drilling process right on the on-board monitor in real time. The drilling process is displayed on the on-board monitors in real-time. Both operator and dispatcher receive the data оn the current depth, the project depth, the angle of the mast, the drilling rate and other important information.

The drill operator receives the project right from the office software, which decreases your dependency on survey operations like mine surveying and grid marking.

DrillManager tracks the drill rate, depth to the target goal, drilling time and other key parameters. Monitoring this data in real time allows you to analyze rock density at the certain depths and other landscape irregularities and thus promptly adapt the plans for blasting operations.

Achievable goals

Advantages

01
Increases the efficiency of your drilling operations
02
Makes sure you accurately reach the target depth of the project, gives you control over the depth of the drilled hole.
03
Makes sure the drilling operations are carried out according to the project grid.
04
Helps your production to be less affected by the hours of darkness and limited visibility conditions
05
High precision navigation and positioning (up to ± 10см)
06
Reduce the survey costs on the marking of the grid and checking the drilling results
  • Automatically positions the drill over the hole with the accuracy of centimeters.
  • Automated processing of the drilling projects.
  • Precise compliance to the project grid.
  • Compliance to the target depth of the hole, automatic re-calculation of the drilling depth based on encountered landscape irregularities.
  • Production is less affected by the hours of darkness and limited visibility conditions.
  • Reduces the survey costs on the marking of the grid and checking the drilling results.
  • Records drilling time and idle time of the drill.
  • Indicates the control max and min values for the drilling parameters to the operator.
  • Loads the project files right from the software they were created in.
  • Records all the events, alarms and work logs on the on-board computer.
  • Tracks the consumption of the drill tools and consumables.
  • Automated processing of the drilling projects.

  • Precise compliance to the project grid.

  • Compliance to the target depth of the hole, automatic re-calculation of the drilling depth based on encountered landscape irregularities.

  • Production is less affected by the hours of darkness and limited visibility conditions

  • Reduces the survey costs on the marking of the grid and checking the drilling results

  • Records drilling time and idle time of the drill.

  • Loads the project files right from the software they were created in.

  • Records the depth and drilling time for every hole.

  • Tracks the consumption of the drill tools and consumables.

  • Records drilling time and idle time of the drill.
  • Loads the project files right from the software they were created in.
  • Records the depth and drilling time for every hole.
  • Standard precision navigation – displays the drills, other equipment and danger zones on the map of the mine site.
  • Tracks the consumption of the drill tools and consumables.

Get the brochure